The next next major fleet unit to be commissioned into the RAN, NUSHIP Supply (II), has undertaken Sea Acceptance Trials in Spain. It is the lead ship of two Supply Class Auxiliary Oiler Replenishment (AOR) ships currently being built for the Royal Australian Navy by Spanish shipbuilder, Navantia. The Australian Supply Class ships are based on the Spanish Navy’s Cantabria Class design.