Columbia-class’s cost overrun

0
2244

The US Navy’s ambitious plan to construct 12 Columbia-class submarines equipped with intercontinental ballistic missiles (ICBM) could hit the wall owing to the cost overruns of US$20 million, or about 20% of the projected cost, The Eurasian Times reports.

Please Login to view this content. (Not a member? Join Today!)
You do not have permission to view the comments.

Leave a Reply

Your email address will not be published. Required fields are marked *